Home
About
About Us FAQ
Epoxy Flooring
Garage Epoxy Residential Epoxy Commercial & Industrial Warehouse Epoxy Automotive Epoxy Aircraft Hangar Epoxy Healthcare Epoxy Restaurant & Kitchen Metallic Epoxy Basement Epoxy Parking Garage Epoxy Epoxy Repair
Concrete Services
Concrete Polishing Polished Concrete Floors Concrete Grind & Seal Stained Concrete Floors
Floor Coatings
Polyaspartic Coating Polyurea Coating Urethane Cement ESD Anti-Static Epoxy Epoxy Flake System Get a Free Quote
Buyer Guide
October 28, 2026·11 min read

How to Get and Compare Epoxy Floor Quotes in Denver

Three quotes for the same floor can land far apart, and the gap is almost always scope, not profit. Send a written specification first, then normalize what comes back line by line.

3
Quotes Worth Collecting
7 lines
In the Scope Sheet You Send
CSP 2 to 3
Typical Garage Prep Profile

Quick answer: to compare epoxy quotes fairly, write the scope yourself before you ask anyone to price it, send the same sheet to three contractors, and then line up what they return on prep method, film thickness, number of coats, flake coverage and topcoat chemistry. Epoxy quotes differ because the scopes differ. Once the scopes match, the spread usually shrinks a lot.

The step most buyers skip is the first one. A contractor who gets a phone call and a photo will price what they assume, and each assumes something different. Our epoxy garage floor work in Denver starts with a site visit and a written scope for exactly this reason. This post gives you the tools to run the same process yourself: a seven-line specification to send out, a normalization table for the answers, the allowances that hide in the fine print, what a site visit should cover, and the payment terms that are normal in this trade.

Why Three Quotes for the Same Floor Can Differ by a Factor of Three

Quotes differ by that much because the work behind each price is different, and the biggest differences sit in the part of the job you cannot see once it is finished. Prep and film thickness are hidden under the topcoat, so they are the first places a low price saves money.

Scope ElementThin Quote Often IncludesFull Quote Often Includes
Surface prepWash and acid etchDiamond grinding to a measured profile
Crack and joint workNot mentionedRouted, filled and leveled
Moisture checkNoneTested, with a recorded result
BuildOne coatPrimer or base coat plus build coat and topcoat
ThicknessNot statedTotal dry film thickness stated in mils
TopcoatStandard epoxyUV-stable topcoat such as polyaspartic

Two further things widen the spread. One is crew type, since a quote that assumes in-house labor and one that assumes a subcontractor carry different overhead. The other is warranty, because a written warranty that names its exclusions costs the contractor something to offer. We cover how to vet a contractor in our questions to ask an epoxy contractor guide, so here the focus stays on the quote documents themselves. For how pricing is built and what typical totals look like, see our epoxy flooring cost guide. This post does not repeat those numbers, because a price means little until the scope behind it matches.

Write the Scope Before You Ask: The Seven Lines to Send Every Bidder

Send each bidder the same seven lines, because a shared written scope is the only way to get prices that can be compared. It takes about ten minutes to write and removes most of the guessing from the quotes.

#LineExample Wording
1Area and layoutTwo-car garage, measured square footage, one photo of each wall, door and drain location
2Slab condition you know aboutAge of slab, existing paint or sealer, oil stains, cracks, any past water problems
3Prep method requiredDiamond grinding to a concrete surface profile of CSP 2 to 3, no acid etching
4System buildNumber of coats, minimum total dry film thickness in mils, flake coverage and size
5TopcoatUV-stable topcoat, product named, gloss level
6Repairs and moistureCrack and joint repair included, moisture test method and result recorded
7Schedule, warranty and paymentStart window, return-to-service times, written warranty terms, payment schedule

Line 3 deserves a note. CSP is the concrete surface profile scale from the International Concrete Repair Institute (ICRI Guideline 310.2R), which runs from CSP 1 for acid etching up to CSP 10, and a garage system typically wants a profile in the CSP 2 to 3 range. Diamond grinding can reach it. Acid etching generally cannot, which is why it is a flag when a quote offers it as the only prep. Line 4 matters because a stated minimum thickness can be checked, and a vague "multi-coat system" cannot. Our own residential specification uses 15 to 18 mils total for a standard garage and a minimum of 20 mils for heavy-vehicle garages, and you can use those as reference points when you fill in your sheet.

Ask every bidder to answer against the same numbered lines. A quote that skips a line has told you something, and you can follow up on that line alone.

Normalizing What Comes Back: Prep Tier, Mil Thickness, Coats, Flake, Topcoat

Normalize by copying each quote into one table, row by row, and marking every blank, because a blank is an assumption you have not agreed to. Do this before you look at the totals. Price is the last column for a reason.

RowWhat to RecordWhy It MattersFlag
Prep tierGrind, shot blast, etch, or unstatedSets how well the coating bondsEtch only, or no method named
ProfileCSP number or "not specified"Can be checked on siteNo number given
CoatsPrimer, base, build, broadcast, topcoatEach layer has a job"Epoxy coating" with no layers listed
Total thicknessMils dry film, minimumThin films wear and telegraph defectsNo mil figure
FlakeFull broadcast to rejection, partial, or noneChanges both look and texture"Flake" with no coverage stated
TopcoatChemistry and product nameUV stability and abrasion resistanceStandard epoxy, or no topcoat
Slip resistanceAdditive or texture, any test referenceGarages get wetNothing stated

Two terms cause trouble. "Full flake" and "partial flake" are not standardized, so ask whether the flake is broadcast to rejection, meaning scattered until no more sticks, or sprinkled lightly. Slip resistance can be described by the dynamic coefficient of friction method in ANSI A326.3, and you can ask whether the proposed finish has been tested to it. Do not expect a number for every system, but a contractor who has thought about it will say how traction is achieved.

After the rows are filled in, bring the quotes to the same specification. If one contractor includes grinding and another does not, ask the second what grinding would add. Now you are comparing prices for the same floor, and a spread that looked like a factor of three often narrows to something you can explain line by line. Our guide to choosing epoxy flooring contractors in Denver covers who to invite in the first place.

Allowances and Exclusions: Crack Repair, Moisture Mitigation, Grinding of Old Coating

Allowances and exclusions are where a low quote recovers its margin, so read what each quote leaves out as carefully as what it includes. An exclusion is not a trick, because some conditions cannot be known before the work starts, but it should be stated with a price attached.

ItemAsk the ContractorGood Answer
Crack and joint repairIs it included, and how many linear feet?Included up to a stated length, with a rate beyond it
Control jointsFilled, or left open?Method stated; open joints are usually filled with a semi-rigid material
Moisture testingWhich method, and who decides the limit?ASTM F2170 or F1869 named, limit taken from the coating data sheet
Moisture mitigationWhat happens if readings are high?A priced mitigation option, not a surprise
Old coating removalIs grinding off paint or an old sealer included?Included, or priced per square foot after a bond test
Oil contaminationIs it treated before coating?Yes, with the method named

The two moisture standards measure different things. ASTM F2170 uses probes placed in the slab to read relative humidity inside it. ASTM F1869 measures vapor emission at the surface with calcium chloride, and it is not suitable for lightweight aggregate concrete. Neither one sets a universal pass limit, since the coating manufacturer sets the number for its own product. A quote that says "moisture tested" without naming a method or recording a result has not told you much. Our guide to testing slab moisture before coating explains the numbers.

Where an old coating is present, adhesion is the question. A pull-off test, the method behind ASTM D4541, measures how strongly a coating holds to its substrate. Most garage jobs do not need lab testing, but a contractor who proposes coating over an old layer should be able to explain how they know it is sound.

What a Site Visit Should Cover, and What a Quote Given Without One Is Worth

A site visit should cover everything a photo cannot show, and a quote given without one is an estimate with a price tag on it. For a bare, new slab a phone quote can be close. For anything older, the visit is where the real scope appears.

Visit ItemWhat the Contractor DoesWhy a Photo Cannot Replace It
Slab surfaceChecks hardness, laitance, existing coating and dustingCondition is felt and scratched, not seen
Cracks and jointsMeasures and maps themWidth and movement are hard to judge in a picture
MoistureRuns a test or plans oneDry-looking slabs can still emit vapor
ContaminationLooks for oil and chemical stainingOld oil often shows only after grinding
Drainage and slopeChecks floor drains and low spotsPonding changes the system
Access and conditionsNotes door height, power, temperature, vehicles to moveAffects schedule and cure

A firm price given sight unseen will usually be paired with change-order language, so read for phrases like "price subject to site conditions." That is not wrong, but it means the number is provisional. In Denver, one condition deserves a specific question: cold weather. Temperature affects cure, so ask how the contractor handles a garage that cannot be heated. The site visit is also the moment to get everything written down. If a contractor says it verbally, ask them to put it in the quote. We do not charge a deposit to get a quote, and you should not pay one for an estimate from anyone.

Payment Schedule, Deposit and Change Order Terms That Are Normal in This Trade

A deposit of roughly a quarter to a third of the contract, covering materials, with the balance due on completion is a common structure in this trade. Be cautious about any contractor who asks for most of the money before the work begins, and get the schedule written into the contract.

TermCommon PracticeBe Cautious When
DepositAbout one quarter to one third, for materialsMost of the price is due before work starts
BalanceDue on completion and walkthroughDue before the floor is finished
Change ordersWritten, priced and signed before extra workExtra work is done on a verbal okay
WarrantyWritten, with scope, length and exclusions namedVerbal only, or no exclusions listed
Cure and return to serviceStated times for foot traffic and vehiclesNo times given
Quote validityA stated periodNo expiry and no scope detail

Change orders deserve a sentence of their own. Any work that falls outside the written scope should be priced and signed before it happens, and the quote should say how extra crack repair or grinding is charged, per linear foot or per square foot. Ask for that rate at quote time, while you still have three bidders to compare it across. Then compare the finished sheets, pick the contractor whose scope is most complete rather than whose price is lowest, and ask the others whether they would revise their quotes to match it. If you want us to price your floor against the same sheet, request a quote and send it along.

Frequently Asked Questions

How many epoxy floor quotes should I get?+

Three is the useful number. One gives you no reference, two tends to split the difference, and more than three rarely adds information. What matters more than the count is that all three price the same written scope.

Why are epoxy floor quotes so different from each other?+

Almost always prep and thickness. A quote that includes diamond grinding, crack repair and a three coat system at twenty mils cannot be compared with one that includes a wash, an etch and a single coat. Normalize the scope and the spread usually shrinks a lot.

Should an epoxy contractor visit before quoting?+

For anything beyond a bare, new slab, yes. Slab moisture, existing coatings, cracks, oil contamination and drainage all change the scope, and none of them are visible in a photograph. A firm price given sight unseen will come with change orders.

What deposit is normal for an epoxy floor?+

A deposit in the range of a quarter to a third of the contract covering materials is common, with the balance on completion. Be cautious about paying the majority up front, and get the payment schedule written into the contract rather than agreed verbally.

Can I ask a contractor to match a lower quote?+

You can, but ask what they would remove to get there rather than asking for the same scope cheaper. The honest answer is usually a thinner build, a lighter prep tier or a cheaper topcoat, and then you can decide whether that tradeoff is one you want.

Send Us Your Scope Sheet

We will walk the floor, price the same seven lines and put every allowance in writing.

Call Now: (888) 275-7078